Live Mains Insertion (LMI)
plus Pressure Upgrade

Product List
Video
LMI Details
Endseal Video
Insertion Seal Video
Pushing Machine Video
Live Mains replacement and pressure upgrade in one step.

Live Mains Insertion
Entry pit with pushing machine set for 2" PE into 4" cast iron
Customers remain on the existing low pressure supply throughout the entire upgrade except for a short interruption when the service is transferred to the medium pressure PE main. The crew can be pulled off the job at any time and the completion of an insertion project can be delayed, for weeks if necessary.

There are just three disposable components:
  1. An Entry Gland allows the PE pipe to enter the cast iron without leakage.


  2. An Insertion Seal foam kit fills the annular gap between the new PE and the original main to provide a barrier between the inserted section of the main and the rest of the network. They are also used to section the main into those service groups that are to be transferred to the PE in a given day.


  3. An End Seal foam kit is used to close off the exposed end of the cast iron pipe wherever the new PE main exits.
Live Mains Insertion
LMI Entry Gland showing tracer wire entering parallel to the PE
  • A pneumatic or hydraulic pushing machine is used to push the PE the required distance.


  • Service transfers are made when it is convenient for both the customers and the utility without the urgency to complete a project in a single day.


  • Mains upgraded with LMI are usually in the 4"-8" range although mains as large as 16" have been successfully inserted with 12" PE.


  • The one-time license fee includes initial on-site training. There are no footage charges and the license covers the utility and their contractor.